MPG Motor Mount / Header Kit Installation Instructions
Please read and understand all instructions before starting the installation.
Installing the Motor Mounts:
Installing the Custom 2" Headers
It is very important to follow the header tube sequence for successful installation. We recommend chasing the header bolt threads in the heads before starting the job.
Locate #6 exhaust port (2nd port from the front on the driver's side). This is where you will begin your installation. Notice that each exhaust port has 2 header bolt holes, a front and a rear. Also note that the header flanges are slotted. The trick is to install the rear header bolt by hand several turns first. Then from the bottom of the car, feed the tube up and "hook" it onto the rear bolt. Then install the front bolt and tighten both.
Driver's Side
Passenger's Side
Repeat the sequence outlined above but on the passenger's side of the vehicle.
Start with the #2 tube. Be sure to tighten the bolts of #2 and #3. Leave #4 and #1 somewhat loose while installing the collector.
Quick Tips
#2 and #3 tubes may need to be fed from the bottom at the same time because at the collector #2 is on top of #3. This can be confusing but easy to solve once you're expecting it.
After firing the engine, retighten the header bolts periodically. It is hard to tighten #2 and #6 header bolts after the other tubes are installed. This is why it is important to tighten them well when they are first installed.
If you have any questions concerning the installation of the MPG Motor Mount/Header Kit, please contact us at (303) 762-8186.
Return to Header/Motor Mount catalog description.